Root and #1 ribs

Posted on Updated on

The first two ribs need modified so the root carry though gussets and brackets can be installed.

The #1 rib at the rear spar looks like this.

image
Minimax #1 rib modified for carry through brackets

At the front spar.

image

The root rib was a little more difficult to cut out since it is laminated with plywood.

image
Minimax root rib modified for carry through

The slots for the brackets looks good.

image

When assembled everything for together well.

image

image

image

Now that all the main ribs are completed I can start assembly of the right wing.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s