Leading Edge Plywood Installed

Posted on Updated on

Now that all the varnish is dry its time to attach the RS-539 leading edge plywood.

I used rubber bands to hold the plywood skin tight against the ribs.

image

The skin was stapled to the nose stringer every inch or so. After ensuring the skin was tight against the ribs I stapled it to the spar top and bottom. Each piece was added one at a time.

image

image

The final result looks good.

image

The next step is to cut off the aileron.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s